Overview

Following identification of the potential for reduction in downtime with a rotable spare mill turret, Berg were engaged by CS Energy to design and manufacture a suitable turret solution. Bergs’ Pulveriser Mill Turret solution provided CS Energy with a 63% reduction in costs associated with manufacture and downtime and a 14-week reduction in lead time for production of parts.